Paving work to begin on Dixie Highway - wave3.com-Louisville News, Weather & Sports

Paving work to begin on Dixie Highway

Posted: Updated:

LOUISVILLE (WAVE) - Paving work will begin this week along a three mile stretch of Dixie Highway from Pleasure Ridge Park to I-264 in the Shively area, according to a press release from the Kentucky Transportation Cabinet.

Gohmann Construction Inc. of Clarksville, IN will be conducting the asphalt paving between Greenwood Road and I-264 during evenings and overnight hours. Lane closures are possible between 7:00pm and 6:00am daily. Some of the paving work will be done this Fall while the rest will resume in the Spring and continue through June of 2013.

The Kentucky Transportation Cabinet says that one lane of traffic will stay open in each directions at all times. Shoulder closures are also possible during the daytime hours.

 

 

Copyright 2012 WAVE News. All rights reserved.