LOUISVILLE, KY (WAVE) - Electrical work is being done on the Kennedy Bridge to make it more modern before it reopens later this year with tolls.
The electrical work is being done so the transponder system will work to charge cars.
RELATED STORIES
+ Facts about Ohio River bridges tolling
+ Vehicle classifications for Ohio River bridges tolling released
More than two dozen cameras that will take pictures of cars without accounts or transponders have been installed on the southbound side of the Kennedy.
Tolling is expected to begin sometime in December.
Copyright 2016 WAVE 3 News. All rights reserved.